Home ProductsCement Grout Pump

Cement Slurry Injection Grouting Machine High Pressure Foundation Grout

Cement Slurry Injection Grouting Machine High Pressure Foundation Grout

  • Cement Slurry Injection Grouting Machine High Pressure Foundation Grout
Cement Slurry Injection Grouting Machine High Pressure Foundation Grout
Product Details:
Place of Origin: China
Brand Name: Tytion
Certification: CE, ISO, SGS
Model Number: BW60-10
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Wooden case package
Delivery Time: 3-5 working days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 120 sets per month
Contact Now
Detailed Product Description
Name: Injection Grouting Machine Material: Q235 Steel
Motor(kw): 7.5 Pressure: 10 Mpa
Input Speed: 1440 R/min Vertical Distance(m): 40
Horizontal Distance(m): 500 Cylinder Number: 1 Cylinder

Injection Grouting Machine

 

Description of Injection Grouting Machine:

 

Injection grouting machine can pump the mortar, the sand should be screened, the maximum particle size is not more than 5 mm. Sand with particle size less than 1 mm is more than 60% of the total sand. Stones and other impurities (e.g. nails, grass, etc.) should not be mixed in the grouting. It should be a homogeneous mortar with no dry sand or hard blocks. The consistency value is not less than 8 cm and the consistency is 300 G.

 

Technical parameters of Injection Grouting Machine:

 

Cylinder number 1
Bore diameter 80mm
Piston stroke 90mm
Suction height 2 meter
Diameter of suction pipe 51mm
Diameter of outlet pipe 32mm
Motor power 5.5kw
Main shaft speed 1440 r/min
Working pressure 5 Mpa
Dimension size 1550×550×80mm
Weight 200kg

 

Structure of Injection Grouting Machine:

 

Injection Grouting Machine is mainly composed of pump body, pump frame, air chamber, shock-resistant pressure gauge, motor, V-belt and pulley cover.

The installation foundation of cement grouting pump should be smooth and not inclined.
The pump is fixed on the foundation with the foot screw to prevent the vibration of the pump during operation.
Preparations before pumping:
After the pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission mechanism.
5. Check the looseness of fasteners, especially the screw tightening of rubber piston locking nut, cross head and piston rod connection thread.
6. Check the suction height of the pump. The maximum suction height of the pump should not exceed 2.5 meters in areas below 1000 meters above sea level. In areas above 1000 meters above sea level, the suction height of the pump should be reduced according to the local atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank. Generally, the mud level should be below 0.3-0.5 meters, and the filter should be no less than 0.5 meters away from the bottom of the mud tank.

 

Cement Slurry Injection Grouting Machine High Pressure Foundation Grout 0

Contact Details
Henan Tytion Machinery Co., Ltd.

Contact Person: Jenny

Tel: +86 15838319046

Send your inquiry directly to us (0 / 3000)

Other Products