Home ProductsCement Grout Pump

Smooth Operation Cement Slurry Prepartion Grout Injection Pump Foundation Grout

Smooth Operation Cement Slurry Prepartion Grout Injection Pump Foundation Grout

  • Smooth Operation Cement Slurry Prepartion Grout Injection Pump Foundation Grout
Smooth Operation Cement Slurry Prepartion Grout Injection Pump Foundation Grout
Product Details:
Place of Origin: China
Brand Name: Tytion
Certification: CE, ISO, SGS
Model Number: BW250
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Wooden case package
Delivery Time: 3-5 working days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 120 sets per month
Contact Now
Detailed Product Description
Name: Grout Injection Pump Color: Customized
Motor Power: 15 Kw Pressure: 6 Mpa
Plot Ratio: 90% Suction Pipe Diameter: 64 Mm
Drainage Pipe Diameter: 32 Mm Cylinder: Horizontal Three- Cylinder

Grout injection Pump

 

Description of Grout Injection Pump:

 

Grout injection pump BW-250 type is a horizontal three-cylinder reciprocating single-acting piston pump, which is one of the main supporting equipment for geological exploration. Its main function is to supply flushing fluid (mud or clear water) to the borehole during core drilling, so that it can circulate in the borehole, so as to carry debris back to the ground, cool and lubricate drill bits and drilling tools, and protect the borehole wall from collapse.

 

Technical parameters of Grout Injection Pump:

 

Cylinder number 3
Bore diameter 80mm
Piston stroke 100mm
Diameter of suction pipe 64mm
Diameter of outlet pipe 32mm
Motor power 15kw
Main shaft speed 1450 r/min
Working pressure 6 Mpa

 

Structure of Grout Injection Pump:

 

Grouting pump machine is mainly composed of pump body, pump frame, air chamber, shock-resistant pressure gauge, motor, V-belt and pulley cover.

The installation foundation of cement grouting pump should be smooth and not inclined.
The pump is fixed on the foundation with the foot screw to prevent the vibration of the pump during operation.
Preparations before pumping:
After the pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission mechanism.
5. Check the looseness of fasteners, especially the screw tightening of rubber piston locking nut, cross head and piston rod connection thread.
6. Check the suction height of the pump. The maximum suction height of the pump should not exceed 2.5 meters in areas below 1000 meters above sea level. In areas above 1000 meters above sea level, the suction height of the pump should be reduced according to the local atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank. Generally, the mud level should be below 0.3-0.5 meters, and the filter should be no less than 0.5 meters away from the bottom of the mud tank.

 

Smooth Operation Cement Slurry Prepartion Grout Injection Pump Foundation Grout 0

Contact Details
Henan Tytion Machinery Co., Ltd.

Contact Person: Jenny

Tel: +86 15838319046

Send your inquiry directly to us (0 / 3000)

Other Products